Products

ZA Chemical Centrifugal Pump

Home > Products > ZA Chemical Centrifugal Pump

ZA Chemical Centrifugal Pump

Product inquiry: 0523-84832479

Product introduction

The ZA petrochemical process pump serves a range of process fluids and duties with a modular, single-stage cantilever construction.

Product presentation

Product overview

The ZA series is a single-stage cantilever petrochemical process pump designed with reference to API 610 (8th edition) and VDMA 24297 (light/medium duty).

The series can replace some comparable imported pumps and IH, CZ and AY types. Verify the performance and installation interfaces for each specific duty before replacement.

The series covers a broad performance range and offers multiple construction variants for different fluids and duties.

Its modular design provides interchangeability of shafts, covers, seal rings, mechanical seals and bearings across sizes to simplify maintenance and spare-parts management.

Construction features

  • Single-stage, single-suction horizontal pump with axial suction, radial discharge and OH1 foot-mounted casing.
  • The closed impeller has balance holes and wear rings to reduce axial thrust, with residual thrust carried by the thrust bearing. Open impellers use front and rear wear plates.
  • Shaft sealing options include packed glands, single mechanical seals and double mechanical seals, with flush, cooling or barrier-fluid systems as required.
  • Clockwise rotation when viewed from the motor end.

Performance parameters

Series reference ranges

ZA performance parameters
ParameterSymbolValueUnit
Outlet diameterDN25~400mm
FlowQup to 2600m³/h
HeadHup to 300m
Speedn1450/2900r/min
Working pressurePup to 2.5MPa
Working temperatureT-80~+300℃
Design standard—API 610 / VDMA 24297 (light/medium duty)—

Note: These are series reference ranges. Refer to the selected model and supplied technical documentation for actual parameters.

Applications

The series is suitable for process-fluid transfer in the following fields:

  • Refining, petrochemicals, coal chemicals and cryogenic service
  • Chemical industry, pulp and paper, sugar and general process industries
  • Water plants and desalination
  • Heating and air-conditioning
  • Power engineering, including desulfurization and ash handling
  • Environmental protection
  • Marine and offshore facilities

Design and selection boundaries

Confirm the following design and operating boundaries during selection and use:

  • The series is designed with reference to API 610 (8th edition) and VDMA 24297 (light/medium duty). The applicable edition, suitability, certification status and configuration are determined by the selected model, project requirements and supplied technical documentation; no unconditional compliance with every standard is implied.
  • The casing uses OH1 foot mounting; the installation, thermal-growth and nozzle-load conditions of OH2 centerline support do not apply to this construction.
  • Comparable imported pumps and IH, CZ and AY types may be replaced only after checking hydraulics, connections, dimensions, materials, standards and project requirements.
  • Performance values are series nominal ranges. Confirm the actual operating point against the selected model and supplied technical documentation.

Confirm the final parameters and construction configuration against the selected model and supplied technical documentation.

Product information

Model designationZA Chemical Centrifugal Pump
Catalog categoryChemical Centrifugal Pump

Related questions

How is the duty point of a chemical centrifugal pump determined?

Build the system curve from static head, piping loss, equipment differential pressure and pressure conditions at target flow, then find its intersection with the exact pump curve.

Without the exact curve, material list and seal configuration, only the review method can be stated; final size, life or operating outcome cannot be confirmed.

What should be confirmed before selecting or working on pumps for corrosive, flammable, explosive, toxic or volatile media?

Obtain the SDS and complete duty first, identify corrosion, toxicity, fire/explosion, volatility, reactivity and exposure routes, then review wetted materials, containment/disposal, hazardous-area equipment, monitoring, emergency and personnel controls separately. A pump-family name does not establish risk control.

The project owner or responsible team must confirm site safety through professional risk assessment, relief and disposal design, hazardous-area equipment compliance, rescue arrangements and medical and occupational-health requirements.

Which equipment information is needed when requesting an operation manual?

Provide the complete model and model suffix, a clear nameplate photo, order or serial information, current configuration and required language. If the unit has been modified, describe the change so the manual is not matched from the series name alone.

An unregistered file requires public-release approval before it is shared. A filename, product photo or similar model cannot replace complete equipment-identity and revision checks.

What is the minimum data set for pump selection and enquiry?

Provide medium composition, concentration, density, viscosity and temperature; normal/minimum/maximum flow and head; suction, discharge and system pressure; available NPSH; solids or particle data; installation arrangement and space; power supply; and environmental conditions including indoor/outdoor location, temperature/humidity, altitude and hazardous-area classification.

The selection-input checklist gathers process and equipment information. Process design, piping calculations, final material configuration, hazardous-area suitability review and final quotation require the complete project package, and every missing field must remain explicitly open.

What should be checked first for the foundation and installation space?

First confirm foundation dimensions, anchor locations, load capacity and level from the order drawing. Then isolate the unit from adjacent-machine vibration and retain access for lifting, motor removal, inspection and disassembly.

Civil calculations, piping stress analysis, lifting plans, electrical codes, site safety approval and order drawings must be confirmed by the responsible disciplines and project documents. Dimensions from a similar model must not replace order drawings.

Which pumps require coupling-alignment checks?

Use the sectional drawing to identify direct drive, a separate coupling or a vertical shaft arrangement. Apply the model-specific alignment procedure only to the relevant connection; one tolerance does not fit every pump.

Alignment tolerance, jog duration and electrical steps must be determined for the exact model and site procedure. Perform a rotation check only after energy control, guarding and site authorization are complete.

Why is one start-up valve arrangement unsuitable for every pump?

Conventional centrifugal, self-priming and submerged pumps, as well as magnetic-drive pumps with different circulation paths, have different suction states, venting paths and permissible flow ranges. Valve positions must match the exact model and system control logic.

Remote start-up must follow the site authorization procedure. Valve positions, vent cycles and closed-valve duration must be determined from the matching manual revision and site procedure, and must not be transferred across models.

Which signals should be monitored during normal pump operation?

As configured, record flow, suction/discharge pressure, current, speed or frequency, vibration, sound, bearing or critical-point temperature, plus level, flushing, cooling and alarm states.

The site team must confirm continued operation through interlock settings, instrument calibration, root-cause analysis and maintenance permits. Do not restart until the cause and safety conditions are confirmed.

What must be completed before maintenance or disassembly?

Follow site procedure for shutdown, energy isolation, valve locking, depressurization, cooling, draining, flushing or decontamination, and verify that unintended start is prevented. Hazardous media also require the applicable work permit and personal protection.

Do not substitute drawings, part dimensions or materials from a similar model. A single symptom cannot establish root cause or a replacement part without site inspection.

How are wetted materials selected for a chemical centrifugal pump?

Use full composition, concentration, temperature, contaminants and cleaning phases to review casing, impeller, shaft, seal, lining and gasket materials separately.

Without the exact curve, material list and seal configuration, only the review method can be stated; final size, life or operating outcome cannot be confirmed.