W/WB Chemical Centrifugal Pump
Product inquiry: 0523-84832479Product introduction
W and WB vortex pumps are intended for low-flow, high-head duty with neutral or corrosive clean liquids at -20 °C to +80 °C and viscosity not exceeding 50 °E.
Product presentation
Product overview
W and WB vortex pumps handle low-flow, high-head service with liquids at -20 °C to +80 °C and viscosity up to 50 °E. They are suitable for neutral or corrosive clean liquids without solids. Main parts include the casing, impeller, cover, bearing bracket, coupling, mechanical seal and baseplate. The inlet and outlet are inclined upward and can be piped vertically; radial-in/vertical-out and axial-in/vertical-out variants are also available, giving three configurations.
Construction and features
- Main parts include the casing, impeller, cover, bearing bracket, coupling, mechanical seal and baseplate.
- The inlet and outlet are inclined upward and can be piped vertically; radial-in/vertical-out and axial-in/vertical-out versions are also available, giving three configurations.
- The impeller can float axially so both side clearances tend to equalize, reducing axial force and stabilizing performance.
- The cover-to-casing gasket is PTFE (F4), not exceeding 40 μm thick.
Performance parameters
Series reference ranges
| Parameter | Symbol | Value | Unit |
|---|---|---|---|
| Flow | Q | 0.36~14.4 | m³/h |
| Head | H | 15~150 | m |
| Speed | n | 2900 | r/min |
| Working pressure | P | 1.6~2.5 | MPa |
| Working temperature | T | -20~+80 | ℃ |
Note: These are series reference ranges. Refer to the selected model and supplied technical documentation for actual parameters.
Applications
The series is suitable for the following liquid-transfer duties:
- Low-flow, high-head liquid transfer
- Neutral or corrosive clean liquids without solids
Design and selection boundaries
Confirm the following boundaries against the actual duty during selection and use:
- The applicable media are neutral or corrosive clean liquids without solid particles, at -20 °C to +80 °C and viscosity up to 50 °E. Confirm suitability against the actual medium and duty.
- Performance parameters are series ranges. Confirm the actual operating point, materials, seal arrangement and construction variant against the selected model and supplied technical documentation.
- The viscosity limit is 50 °E; confirm medium suitability against this condition during selection.
- Available connection arrangements are: inclined inlet piped vertically; radial inlet/vertical outlet; and axial inlet/vertical outlet.
- The F4 cover-to-casing gasket has a maximum thickness of 40 μm.
- The vortex pump has its own performance curves and construction definitions; centrifugal-pump performance curves, construction definitions and solids-handling capability do not apply to it.
Confirm final parameters and construction against the selected model and supplied technical documentation.
Product information
| Model designation | W/WB Chemical Centrifugal Pump |
|---|---|
| Catalog category | Chemical Centrifugal Pump |
Related questions
How is the duty point of a chemical centrifugal pump determined?
Build the system curve from static head, piping loss, equipment differential pressure and pressure conditions at target flow, then find its intersection with the exact pump curve.
Without the exact curve, material list and seal configuration, only the review method can be stated; final size, life or operating outcome cannot be confirmed.
What should be confirmed before selecting or working on pumps for corrosive, flammable, explosive, toxic or volatile media?
Obtain the SDS and complete duty first, identify corrosion, toxicity, fire/explosion, volatility, reactivity and exposure routes, then review wetted materials, containment/disposal, hazardous-area equipment, monitoring, emergency and personnel controls separately. A pump-family name does not establish risk control.
The project owner or responsible team must confirm site safety through professional risk assessment, relief and disposal design, hazardous-area equipment compliance, rescue arrangements and medical and occupational-health requirements.
Which equipment information is needed when requesting an operation manual?
Provide the complete model and model suffix, a clear nameplate photo, order or serial information, current configuration and required language. If the unit has been modified, describe the change so the manual is not matched from the series name alone.
An unregistered file requires public-release approval before it is shared. A filename, product photo or similar model cannot replace complete equipment-identity and revision checks.
What is the minimum data set for pump selection and enquiry?
Provide medium composition, concentration, density, viscosity and temperature; normal/minimum/maximum flow and head; suction, discharge and system pressure; available NPSH; solids or particle data; installation arrangement and space; power supply; and environmental conditions including indoor/outdoor location, temperature/humidity, altitude and hazardous-area classification.
The selection-input checklist gathers process and equipment information. Process design, piping calculations, final material configuration, hazardous-area suitability review and final quotation require the complete project package, and every missing field must remain explicitly open.
What should be checked first for the foundation and installation space?
First confirm foundation dimensions, anchor locations, load capacity and level from the order drawing. Then isolate the unit from adjacent-machine vibration and retain access for lifting, motor removal, inspection and disassembly.
Civil calculations, piping stress analysis, lifting plans, electrical codes, site safety approval and order drawings must be confirmed by the responsible disciplines and project documents. Dimensions from a similar model must not replace order drawings.
Which pumps require coupling-alignment checks?
Use the sectional drawing to identify direct drive, a separate coupling or a vertical shaft arrangement. Apply the model-specific alignment procedure only to the relevant connection; one tolerance does not fit every pump.
Alignment tolerance, jog duration and electrical steps must be determined for the exact model and site procedure. Perform a rotation check only after energy control, guarding and site authorization are complete.
Why is one start-up valve arrangement unsuitable for every pump?
Conventional centrifugal, self-priming and submerged pumps, as well as magnetic-drive pumps with different circulation paths, have different suction states, venting paths and permissible flow ranges. Valve positions must match the exact model and system control logic.
Remote start-up must follow the site authorization procedure. Valve positions, vent cycles and closed-valve duration must be determined from the matching manual revision and site procedure, and must not be transferred across models.
Which signals should be monitored during normal pump operation?
As configured, record flow, suction/discharge pressure, current, speed or frequency, vibration, sound, bearing or critical-point temperature, plus level, flushing, cooling and alarm states.
The site team must confirm continued operation through interlock settings, instrument calibration, root-cause analysis and maintenance permits. Do not restart until the cause and safety conditions are confirmed.
What must be completed before maintenance or disassembly?
Follow site procedure for shutdown, energy isolation, valve locking, depressurization, cooling, draining, flushing or decontamination, and verify that unintended start is prevented. Hazardous media also require the applicable work permit and personal protection.
Do not substitute drawings, part dimensions or materials from a similar model. A single symptom cannot establish root cause or a replacement part without site inspection.
How are wetted materials selected for a chemical centrifugal pump?
Use full composition, concentration, temperature, contaminants and cleaning phases to review casing, impeller, shaft, seal, lining and gasket materials separately.
Without the exact curve, material list and seal configuration, only the review method can be stated; final size, life or operating outcome cannot be confirmed.