CFZB-L Fluoroplastic-Lined Self-Priming Pump
Product inquiry: 0523-84832479Product introduction
The CFZB-L self-priming centrifugal pump is designed for highly corrosive service. The wetted components, including the pump casing, inlet and pump cover, use metal castings as a base with a fluoroplastic lining. The fluoroplastic is high-temperature sintered and compression molded so that it is anchored firmly to the metal base as one body. The lining is designed not to shell, separate or bulge under static vacuum or when the conveyed medium undergoes physical changes at high or low temperature, while the metal casing maintains its mechanical strength. The fluoroplastic lining provides strong corrosion and oxidation resistance, pressure resistance, vacuum resistance and high-temperature resistance. The pump is suitable for conveying acids, alkalis, salts, strongly corrosive liquids, strong oxidants and various chemical reagents at any concentration within a temperature range of -80°C to 160°C.
Product presentation
Product overview
The shaft seal is externally mounted, single-end-face, balanced and self-adjusting, and does not require cooling water. WB2 and 169 mechanical-seal types are available for different operating conditions.
CFZB and CFZB-L models provide high-performance self-priming, fast self-priming and high suction lift for lifting and transferring liquids from pools, tanks, pits, sumps and unloading points at low liquid levels.
Two pump arrangements are available: close-coupled (CFZB) and shaft-coupled (CFZB-L), allowing selection for different duties, installation sites and performance requirements with economy and long service life.
Model designation
80CFZB-45L
- 80
- Pump inlet diameter (mm)
- CFZB
- Fluoroplastic-lined self-priming pump
- 45
- Head (m)
- L
- Shaft-coupled; without L, close-coupled

CFZB construction and component names
- 1. Inlet
- 2. Check gasket
- 3. Inlet cover
- 4. Gas-liquid separation chamber
- 5. Pump casing
- 6. Drain plug
- 7. Impeller
- 8. Pump cover
- 9. Seal gland
- 10. Mechanical seal
- 11. Suspension frame
- 12. Round nut
- 13. Lifting bolt
- 14. Base plate
- 15. Motor

CFZB-L construction and component names
- 1. Base plate
- 2. Pump casing
- 3. Drain plug
- 4. Inlet cover
- 5. Impeller
- 6. Pump cover
- 7. Inlet suction pipe
- 8. Mechanical seal
- 9. Seal gland
- 10. Check gasket
- 11. Gas-liquid separation chamber
- 12. Intermediate support
- 13. Round nut
- 14. Bearing front cover
- 15. Bearing
- 16. Pump shaft
- 17. Bearing suspension
- 18. Bearing rear cover
- 19. Coupling
- 20. Lifting bolt
- 21. Suspension support
- 22. Motor
Performance parameters
| Model | Flow m³/h | Head m | Inlet diameter mm | Outlet diameter mm | Motor power Kw | Speed r/min | Allowable suction lift m | Efficiency % | Self-priming time S |
|---|---|---|---|---|---|---|---|---|---|
| 25CFZB-20(L) | 3 | 20 | 25 | 20 | 1.5 | 2900 | 3 | 26 | 180 |
| 32CFZB-18(L) | 5 | 18 | 32 | 25 | 1.5 | 2900 | 3 | 28 | 180 |
| 40CFZB-30(L) | 6 | 30 | 40 | 25 | 2.2 | 2900 | 4 | 29 | 240 |
| 40CFZB-45(L) | 6 | 45 | 40 | 25 | 4 | 2900 | 5 | 22 | 240 |
| 50CFZB-30(L) | 12.5 | 30 | 50 | 32 | 3 | 2900 | 4 | 35 | 240 |
| 50CFZB-45(L) | 12.5 | 45 | 50 | 32 | 5.5 | 2900 | 5 | 28 | 240 |
| 50CFZB-75(L) | 12.5 | 75 | 50 | 32 | 11 | 2900 | 5 | 23 | 300 |
| 65CFZB-30(L) | 25 | 30 | 65 | 50 | 5.5 | 2900 | 5 | 45 | 240 |
| 65CFZB-45(L) | 25 | 45 | 65 | 40 | 11 | 2900 | 5.5 | 40 | 300 |
| 65CFZB-75(L) | 25 | 75 | 65 | 40 | 18.5 | 2900 | 6 | 32 | 300 |
| 80CFZB-30(L) | 50 | 30 | 80 | 65 | 11 | 2900 | 5.5 | 60 | 300 |
| 80CFZB-45(L) | 50 | 45 | 80 | 50 | 15 | 2900 | 5.5 | 53 | 300 |
| 80CFZB-75(L) | 50 | 75 | 80 | 50 | 30 | 2900 | 6 | 48 | 300 |
| 100CFZB-30(L) | 100 | 30 | 100 | 80 | 15 | 2900 | 5 | 65 | 300 |
| 100CFZB-45(L) | 100 | 45 | 100 | 65 | 22 | 2900 | 5 | 62 | 300 |
| 100CFZB-75(L) | 100 | 75 | 100 | 65 | 37 | 2900 | 6 | 54 | 300 |
| 125CFZB-45(L) | 200 | 45 | 125 | 100 | 55 | 2900 | 5.5 | 60 | 300 |
Note: The efficiency values specified in this parameter table are for clean water at normal temperature (20°C). The supplied motor power may be changed according to the actual medium density.
Selection and operating notes
Model, material, temperature, flow, head, power and application information is provided for initial selection and is not a guarantee for any specific medium, concentration or duty.
The two body diagrams show the standard CFZB close-coupled arrangement and the CFZB-L shaft-coupled arrangement separately. Their numbered lists must be read together with the diagram immediately above each list; the 15-item and 22-item numbering systems are not interchangeable.
Selection must account for the actual medium, concentration, temperature, density, viscosity, solids, installation height and suction conditions. Confirm the pump material, seal type, motor power and accessories with the supplied technical documents before ordering. The efficiency values in the performance table apply to clean water at 20°C.
The applicable temperature range is -80°C to 160°C. The actual range depends on the wetted-component, seal and gasket materials and does not mean every configuration suits every chemical or operating condition.
Product information
| Model designation | CFZB-L Fluoroplastic-Lined Self-Priming Pump |
|---|---|
| Catalog category | Non-metallic Corrosion-resistant Pump |
Related questions
Are non-metal and fluoroplastic pumps the same thing?
Not exactly. Non-metal is a wider design/material family, while fluoroplastic is one material clue. Solid, lined, clamped, magnetic-drive and sealed designs must still be distinguished.
Do not make unconditional material claims across media or concentration ranges, and do not extend one material/model limit to the whole family.
Does a self-priming pump need no filling on its first start?
Usually not. Most self-priming designs still require the casing to contain the specified liquid under the model manual; the exact method is model-specific.
Fill volume, valve position, suction lift and priming time depend on the model and site layout; follow the site procedure and the manual for the exact model.
What should be confirmed before selecting or working on pumps for corrosive, flammable, explosive, toxic or volatile media?
Obtain the SDS and complete duty first, identify corrosion, toxicity, fire/explosion, volatility, reactivity and exposure routes, then review wetted materials, containment/disposal, hazardous-area equipment, monitoring, emergency and personnel controls separately. A pump-family name does not establish risk control.
The project owner or responsible team must confirm site safety through professional risk assessment, relief and disposal design, hazardous-area equipment compliance, rescue arrangements and medical and occupational-health requirements.
Which equipment information is needed when requesting an operation manual?
Provide the complete model and model suffix, a clear nameplate photo, order or serial information, current configuration and required language. If the unit has been modified, describe the change so the manual is not matched from the series name alone.
An unregistered file requires public-release approval before it is shared. A filename, product photo or similar model cannot replace complete equipment-identity and revision checks.
What is the minimum data set for pump selection and enquiry?
Provide medium composition, concentration, density, viscosity and temperature; normal/minimum/maximum flow and head; suction, discharge and system pressure; available NPSH; solids or particle data; installation arrangement and space; power supply; and environmental conditions including indoor/outdoor location, temperature/humidity, altitude and hazardous-area classification.
The selection-input checklist gathers process and equipment information. Process design, piping calculations, final material configuration, hazardous-area suitability review and final quotation require the complete project package, and every missing field must remain explicitly open.
What should be checked first for the foundation and installation space?
First confirm foundation dimensions, anchor locations, load capacity and level from the order drawing. Then isolate the unit from adjacent-machine vibration and retain access for lifting, motor removal, inspection and disassembly.
Civil calculations, piping stress analysis, lifting plans, electrical codes, site safety approval and order drawings must be confirmed by the responsible disciplines and project documents. Dimensions from a similar model must not replace order drawings.
Which pumps require coupling-alignment checks?
Use the sectional drawing to identify direct drive, a separate coupling or a vertical shaft arrangement. Apply the model-specific alignment procedure only to the relevant connection; one tolerance does not fit every pump.
Alignment tolerance, jog duration and electrical steps must be determined for the exact model and site procedure. Perform a rotation check only after energy control, guarding and site authorization are complete.
Why is one start-up valve arrangement unsuitable for every pump?
Conventional centrifugal, self-priming and submerged pumps, as well as magnetic-drive pumps with different circulation paths, have different suction states, venting paths and permissible flow ranges. Valve positions must match the exact model and system control logic.
Remote start-up must follow the site authorization procedure. Valve positions, vent cycles and closed-valve duration must be determined from the matching manual revision and site procedure, and must not be transferred across models.
Which signals should be monitored during normal pump operation?
As configured, record flow, suction/discharge pressure, current, speed or frequency, vibration, sound, bearing or critical-point temperature, plus level, flushing, cooling and alarm states.
The site team must confirm continued operation through interlock settings, instrument calibration, root-cause analysis and maintenance permits. Do not restart until the cause and safety conditions are confirmed.
What must be completed before maintenance or disassembly?
Follow site procedure for shutdown, energy isolation, valve locking, depressurization, cooling, draining, flushing or decontamination, and verify that unintended start is prevented. Hazardous media also require the applicable work permit and personal protection.
Do not substitute drawings, part dimensions or materials from a similar model. A single symptom cannot establish root cause or a replacement part without site inspection.












