UHB Corrosion- and Wear-Resistant Slurry Pump (Lined Type)
Product inquiry: 0523-84832479Product introduction
The UHB lined corrosion- and wear-resistant slurry pump uses a lined wetted path for corrosive media containing solids. Confirm the material, temperature, seal arrangement and operating conditions against the actual medium and selected configuration.
Product presentation
UHB lined corrosion- and wear-resistant slurry pump

- High-temperature resistance
- High mechanical strength
- Long service life
- Broad application range
These performance advantages depend on the medium, duty and selected model.
MODEL IDENTIFICATION - example 80 UHB-ZK (ZJ) -40 -50, nomenclature only
80UHB-ZK(ZJ)-40-50
- 80
- Suction opening, in mm
- UHB
- Corrosion- and wear-resistant slurry-pump series code
- -ZK
- Dynamic-seal code
- (ZJ)
- Mechanical-seal code
- -40
- Rated flow, in m³/h
- -50
- Rated head, in m
Lined UHB pump assembly

UHB lined corrosion- and wear-resistant slurry pump: selected details
- 01 Selected material: good corrosion resistance and oxidation resistance.
- 02 Special construction: single-suction, single-stage semi-open impeller in a horizontal cantilever arrangement.
- 03 Made with ultra-high-molecular-weight polyethylene: wear, corrosion and impact resistance, self-lubrication, low friction, low water absorption, resistance to material adhesion, non-toxicity and low-temperature performance.
Performance parameters
| Suction opening | DN25~DN250 mm |
|---|---|
| Flow | 3~600 m³/h |
| Head | 5~80 m |
| Speed | 1450 / 2900 r/min |
| Power | 0.75~160 kW |
| Operating temperature | −40~100 °C |
| Pressure rating | 1.6 MPa |
These are UHB lined-series parameter ranges, not guarantees for an individual model. Confirm the medium, flow, head, temperature, materials, seal and motor configuration during selection.
01 Main applications: broad application range
For hydrometallurgy of nonferrous metals, environmental protection and related industries, handling slurries that contain acids, alkalis, salts, corrosive media and solid particles, particularly zinc, manganese, copper, gold, silver, nickel and rare-earth ore slurries.
Confirm medium compatibility, particle conditions, concentration, temperature and duty against the selected model, wetted-part materials and formal technical documentation.
02 Working conditions: customizable to requirements
| Operating temperature range | −40~100 °C (depending on lining material) |
|---|---|
| Wetted-part material | Ultra-high-molecular-weight polyethylene (UHMWPE), subject to selected configuration |
| Configuration | Customizable to requirements |
The operating-temperature range depends on the lining material. Confirm suitability against the medium, particle conditions and selected configuration.
Lined pump assembly working position

03 Design notes: construction and materials
- The construction is single-suction, single-stage, horizontal cantilever with a semi-open impeller; the wetted path uses a lined design.
- The wetted parts use ultra-high-molecular-weight polyethylene (UHMWPE), providing good wear, impact, corrosion and low-temperature resistance, self-lubrication, low friction and low water absorption, with limited adhesion of foreign matter.
- In the model example, -ZK denotes the dynamic-seal code and (ZJ) the mechanical-seal code. Confirm the seal combination, materials, temperature and performance for the ordered configuration; the example is not an individual-pump guarantee.
Product information
| Model designation | UHB Corrosion- and Wear-Resistant Slurry Pump (Lined Type) |
|---|---|
| Catalog category | Non-metallic Corrosion-resistant Pump |
Related questions
Are non-metal and fluoroplastic pumps the same thing?
Not exactly. Non-metal is a wider design/material family, while fluoroplastic is one material clue. Solid, lined, clamped, magnetic-drive and sealed designs must still be distinguished.
Do not make unconditional material claims across media or concentration ranges, and do not extend one material/model limit to the whole family.
What minimum solids data is needed for slurry-pump selection?
Provide at least mass/volume solids content, size distribution and maximum size, hardness, shape, density, settling and crystallisation/agglomeration behaviour.
No UHB-specific detail is published while its text layer remains incomplete; any solids range or material life requires model-primary-source review.
What should be confirmed before selecting or working on pumps for corrosive, flammable, explosive, toxic or volatile media?
Obtain the SDS and complete duty first, identify corrosion, toxicity, fire/explosion, volatility, reactivity and exposure routes, then review wetted materials, containment/disposal, hazardous-area equipment, monitoring, emergency and personnel controls separately. A pump-family name does not establish risk control.
The project owner or responsible team must confirm site safety through professional risk assessment, relief and disposal design, hazardous-area equipment compliance, rescue arrangements and medical and occupational-health requirements.
Which equipment information is needed when requesting an operation manual?
Provide the complete model and model suffix, a clear nameplate photo, order or serial information, current configuration and required language. If the unit has been modified, describe the change so the manual is not matched from the series name alone.
An unregistered file requires public-release approval before it is shared. A filename, product photo or similar model cannot replace complete equipment-identity and revision checks.
What is the minimum data set for pump selection and enquiry?
Provide medium composition, concentration, density, viscosity and temperature; normal/minimum/maximum flow and head; suction, discharge and system pressure; available NPSH; solids or particle data; installation arrangement and space; power supply; and environmental conditions including indoor/outdoor location, temperature/humidity, altitude and hazardous-area classification.
The selection-input checklist gathers process and equipment information. Process design, piping calculations, final material configuration, hazardous-area suitability review and final quotation require the complete project package, and every missing field must remain explicitly open.
What should be checked first for the foundation and installation space?
First confirm foundation dimensions, anchor locations, load capacity and level from the order drawing. Then isolate the unit from adjacent-machine vibration and retain access for lifting, motor removal, inspection and disassembly.
Civil calculations, piping stress analysis, lifting plans, electrical codes, site safety approval and order drawings must be confirmed by the responsible disciplines and project documents. Dimensions from a similar model must not replace order drawings.
Which pumps require coupling-alignment checks?
Use the sectional drawing to identify direct drive, a separate coupling or a vertical shaft arrangement. Apply the model-specific alignment procedure only to the relevant connection; one tolerance does not fit every pump.
Alignment tolerance, jog duration and electrical steps must be determined for the exact model and site procedure. Perform a rotation check only after energy control, guarding and site authorization are complete.
Why is one start-up valve arrangement unsuitable for every pump?
Conventional centrifugal, self-priming and submerged pumps, as well as magnetic-drive pumps with different circulation paths, have different suction states, venting paths and permissible flow ranges. Valve positions must match the exact model and system control logic.
Remote start-up must follow the site authorization procedure. Valve positions, vent cycles and closed-valve duration must be determined from the matching manual revision and site procedure, and must not be transferred across models.
Which signals should be monitored during normal pump operation?
As configured, record flow, suction/discharge pressure, current, speed or frequency, vibration, sound, bearing or critical-point temperature, plus level, flushing, cooling and alarm states.
The site team must confirm continued operation through interlock settings, instrument calibration, root-cause analysis and maintenance permits. Do not restart until the cause and safety conditions are confirmed.
What must be completed before maintenance or disassembly?
Follow site procedure for shutdown, energy isolation, valve locking, depressurization, cooling, draining, flushing or decontamination, and verify that unintended start is prevented. Hazardous media also require the applicable work permit and personal protection.
Do not substitute drawings, part dimensions or materials from a similar model. A single symptom cannot establish root cause or a replacement part without site inspection.











