MDHG Magnetic-Drive Pipeline Pump
Product inquiry: 0523-84832479Product introduction
The MDHG magnetic-drive chemical pipeline pump builds on the IHG stainless-steel pipeline-pump structure with a push-pull magnetic circuit and static sealing. It is a single-stage, single-suction pump with horizontal 180° inlet and outlet connections.
Product presentation
MDHG magnetic-drive pipeline pump

- High temperature
- Mechanical strength
- Long service life
- Broad applications
Confirm final performance and configuration against the selection documents.
Structural overview
Single-stage, single-suction, vertical in-line (OH3) design.
The inlet and outlet are arranged at 180° for direct connection to piping and convenient installation and maintenance.
MDHG vertical structure and piping relationships

Structural components
The pump uses a single-stage, single-suction vertical in-line design with 180° inlet and outlet connections and a magnetic drive with static sealing.
Structural highlights
- 01 Selected materials: 0Cr18Ni9Ti (304), 0Cr18Ni12Mo2Ti (316L), 1Cr13 and CS.
- 02 Product structure: single-stage, single-suction vertical in-line (OH3) design with 180° inlet and outlet.
- 03 Operating characteristics: magnetic drive and static sealing with no shaft-seal leakage.
Product information
| Product name | MDHG magnetic-drive pipeline pump |
|---|---|
| Product model | MDHG |
| Brand | Jiangsu Wuxin Pump Industry Co., Ltd. |
| Dimensions | Customized to customer requirements |
| Origin | Jingjiang, Jiangsu |
Confirm the final configuration against the selected model documentation.
Model identification (series example; final order specification is confirmed by selection)
MDHG100-125G
- MDHG
- Magnetic-drive chemical pipeline centrifugal pump series designation
- 100
- Pump suction and discharge size, mm
- -125
- Pump head, m
- G
- High-temperature code
Performance ranges
| Inlet and outlet size | DN40~DN100 mm |
|---|---|
| Flow | 3.2~100 m³/h |
| Head | 5~125 m |
| Power | 0.55~90 kW |
| Speed | 1450/2900 r/min |
| Pressure rating | 1.6 MPa |
Series reference ranges do not imply that one model reaches every upper limit; confirm performance and installation dimensions for the selected pump.
Application range
For chemical, petrochemical, pharmaceutical, pesticide, metallurgical and environmental-protection industries, conveying clean flammable, explosive, volatile, toxic, corrosive or high-value media.
Also for pipeline boosting or space-constrained installations; confirm suitability against the medium and duty.
Working conditions
| Flow | 3.2~100 m³/h |
|---|---|
| Head | 5~125 m |
| Speed | 1450/2900 r/min |
| Pressure rating | 1.6 MPa |
Flow, head, speed and pressure are series ranges; confirm the operating point and permitted combination in the selection documents.
MDHG operating equipment and piping structure

Structural design features
- Single-stage, single-suction, vertical in-line (OH3) design.
- The inlet and outlet are arranged at 180° for direct connection to piping and convenient installation and maintenance.
- The pump runs smoothly with a small footprint.
- Magnetic drive and static sealing remove the shaft seal and reduce leakage points.
- An optional double isolation sleeve and sleeve-leakage alarm improve protection if the sleeve is damaged.
Product information
| Model designation | MDHG Magnetic-Drive Pipeline Pump |
|---|---|
| Catalog category | Metal Magnetic-drive Pump |
Related questions
How does a magnetic drive transfer motor torque to the impeller?
The motor rotates the outer magnet. Its field acts through the containment shell on the inner magnet, which drives the impeller through the model-specific shaft or connection.
The terms magnetic drive or static containment alone do not establish compatibility, dry-running allowance, solids capability, temperature/pressure limits or site risk.
Should metal magnetic-drive pump selection start with a model or the duty?
Start with the duty. Define medium, temperature, flow, head, pressure, NPSH, solids and installation before screening models by curves and design.
Do not reuse alloy grades, temperature/pressure values or curves from a similar series. Duplicate model candidates are excluded from definitive recommendations until resolved.
What should be confirmed before selecting or working on pumps for corrosive, flammable, explosive, toxic or volatile media?
Obtain the SDS and complete duty first, identify corrosion, toxicity, fire/explosion, volatility, reactivity and exposure routes, then review wetted materials, containment/disposal, hazardous-area equipment, monitoring, emergency and personnel controls separately. A pump-family name does not establish risk control.
The project owner or responsible team must confirm site safety through professional risk assessment, relief and disposal design, hazardous-area equipment compliance, rescue arrangements and medical and occupational-health requirements.
Which equipment information is needed when requesting an operation manual?
Provide the complete model and model suffix, a clear nameplate photo, order or serial information, current configuration and required language. If the unit has been modified, describe the change so the manual is not matched from the series name alone.
An unregistered file requires public-release approval before it is shared. A filename, product photo or similar model cannot replace complete equipment-identity and revision checks.
What is the minimum data set for pump selection and enquiry?
Provide medium composition, concentration, density, viscosity and temperature; normal/minimum/maximum flow and head; suction, discharge and system pressure; available NPSH; solids or particle data; installation arrangement and space; power supply; and environmental conditions including indoor/outdoor location, temperature/humidity, altitude and hazardous-area classification.
The selection-input checklist gathers process and equipment information. Process design, piping calculations, final material configuration, hazardous-area suitability review and final quotation require the complete project package, and every missing field must remain explicitly open.
What should be checked first for the foundation and installation space?
First confirm foundation dimensions, anchor locations, load capacity and level from the order drawing. Then isolate the unit from adjacent-machine vibration and retain access for lifting, motor removal, inspection and disassembly.
Civil calculations, piping stress analysis, lifting plans, electrical codes, site safety approval and order drawings must be confirmed by the responsible disciplines and project documents. Dimensions from a similar model must not replace order drawings.
Which pumps require coupling-alignment checks?
Use the sectional drawing to identify direct drive, a separate coupling or a vertical shaft arrangement. Apply the model-specific alignment procedure only to the relevant connection; one tolerance does not fit every pump.
Alignment tolerance, jog duration and electrical steps must be determined for the exact model and site procedure. Perform a rotation check only after energy control, guarding and site authorization are complete.
Why is one start-up valve arrangement unsuitable for every pump?
Conventional centrifugal, self-priming and submerged pumps, as well as magnetic-drive pumps with different circulation paths, have different suction states, venting paths and permissible flow ranges. Valve positions must match the exact model and system control logic.
Remote start-up must follow the site authorization procedure. Valve positions, vent cycles and closed-valve duration must be determined from the matching manual revision and site procedure, and must not be transferred across models.
Which signals should be monitored during normal pump operation?
As configured, record flow, suction/discharge pressure, current, speed or frequency, vibration, sound, bearing or critical-point temperature, plus level, flushing, cooling and alarm states.
The site team must confirm continued operation through interlock settings, instrument calibration, root-cause analysis and maintenance permits. Do not restart until the cause and safety conditions are confirmed.
What must be completed before maintenance or disassembly?
Follow site procedure for shutdown, energy isolation, valve locking, depressurization, cooling, draining, flushing or decontamination, and verify that unintended start is prevented. Hazardous media also require the applicable work permit and personal protection.
Do not substitute drawings, part dimensions or materials from a similar model. A single symptom cannot establish root cause or a replacement part without site inspection.